Proposed FORTAG 2nd Avenue Underpass
Conceptual map and cross-sections
Drawn by Fred Watson in conjunction with meetings and site visits with Rich Deal (TAMC engineer), Brian McMinn (Marina Public Works Director) & Layne Long (Marina City Manager), and Scott Waltz (FORTAG co-founder).
The cross-sections explore and demonstrate the feasibility of an underpass at this location in relation to terrain, stormwater drainage, and existing utilities.